- Confirmation of cut/fill section
- Observation of existence of deformation
- Check of existing structures regarding location, magnitude and dimensions
- Check of base ground for filling area
- Confirmation of outlet area for drainage
- Confirmation of right of wys
- Confirmation of level crossing regarding location, structure and approach condition
- Checking of existing trunput in station yard
- Survey of ballast quarry regarding location, Capacity and Quality
- Check and Measurement of platform
- Survey stock pile yard
- Check of conditions of long rail installation
- Confirmation of existing bridge regarding location type and magnitude
- Check of high water level of rivers
- Survey access road for transport material bridge
- Check and Measurement of foundation of existing bridge
- Check of existing facilities in station yard regarding power supply, signal equipment, cables routes, telecommunication, signal control system and point machines
- Check of level crossing equipment/operation
- Check of signal cabins
- Observation of CTC center
Tidak ada komentar:
Posting Komentar